01 / PERSPECTIVE
Why blue-green infrastructure should be planned before roads
Water, landscape and movement systems work better when they are planned as one structure rather than added after the masterplan is fixed.
Read the note
Most masterplans begin with a movement network and fit everything else around it. Water, drainage and landscape arrive later, as constraints to be managed rather than as structure to build from.
Reversing the order changes the plan. When the river corridor, flood edge and green connections are set first, they define where development can sit, where it should step back, and where streets can cross water at the right points. Roads then follow a logic the land already provides.
The benefits are practical. Stormwater has room to move. Open space becomes continuous instead of leftover. Blocks gain a clear frontage onto the public realm, and movement alignments can double as greenways.
None of this removes the need for road planning. It asks that water, landscape and movement be designed together, as one structure, before the masterplan is fixed and the cost of change rises.